Home / Categories / Work & Ops / Project Manager
~ Josh Kim
Work & Ops
Project Manager
Marketing project manager that coordinates research, positioning, landing pages, ads, and analytics across specialist bots — with screenshot check-ins and human gates on merge and spend.
Instructions
From the MarketplaceSkills
From the Marketplaceproject-manager-setup
Use on first run, or when the user changes the goal, the date, the workstreams, or the cadence. Four beats: the goal and its date, a pre-filled plan widget, a gameplan widget, then a test drive that writes the plan and delivers the first status pass with screenshots. Runs automatically on the first turn after import.
plan
Use when building or changing the plan: turning a goal and a date into workstreams with a deliverable, an owner, a due date, a dependency, and the gate each one needs. Holds the backwards schedule, the critical path rule, the work item ledger format, and the plan file layout.
delegate
Use when a work item is ready to be worked by someone other than me. Writes the brief, sends it to a teammate with the matching role when one exists, and otherwise hands the user the same brief as a ready-to-run ask with the exact prompt to paste into a specialist bot.
check-in
Use for the scheduled status pass or whenever the user asks where things stand. One line per workstream with what moved, what is blocked, and what is waiting on them, every artifact line carrying its screenshot, plus the chase rules and the quiet-pass rule.
gates
Use whenever something needs a merge, spend, publish, or sign-off decision. Collects the artifact, the evidence, and the risk, asks the user once in one message, holds on silence, records the decision with a timestamp, and runs the creative guardrails before any copy or campaign gate.
retro
Use after the launch date, or when the user calls the campaign done. Reports what shipped, what slipped and by how many days, how long each gate waited, planned date against actual, and one lesson per workstream tied to a real item.
html-report
Use to build the self-contained status or retro report that closes a check-in with changes, the setup test drive, and every retro. Every screenshot is embedded as a data URI so the file renders with nothing missing. Verify it in the browser before delivering.
Routines
From the MarketplaceWeekday status check-in
Disabled by default. Weekdays at 9am in the user's timezone (the user can pick a different time or cadence). Runs one status pass across the workstreams, attaches a screenshot for every artifact it names, chases anything past its date once, and lists the gates waiting on the user. Quiet when nothing moved.
Friday week ahead
Disabled by default. Fridays at 4pm in the user's timezone. Lists what is due in the next 7 days, what the user has to decide to keep the date, and what is already late, read from the plan and the work items. Quiet when nothing is due and nothing is late.
Connectors
From the MarketplaceLinear
Optional. Read and write the work items for this campaign when the team already tracks work there. A plain list in this chat works instead.
Notion
Optional. The plan page, the positioning document, and the ad copy review document when the team keeps them there. A file under /workspace/pm/ works instead.
Slack
Optional. Deliver the status pass to a channel you name instead of this chat, and read the project channel for what moved. Never a destination for a gate, which is always asked in this conversation.
Google Drive
Optional. Where briefs, positioning documents, ad copy review documents, and the exports behind the ads and analytics workstreams live. Read and write, no secrets.
Google Calendar
Optional. Reads the launch date, the review meetings, and the days the user is away, so the schedule and the gate dates are real. Read only.
Other details
Not shared yetNot shared yet, creator can add it.